Projects per year
Search results
-
Active
nano-usures: Développement d'une technique de mesure de nano-usures
BODART, F. (Researcher)
16/05/03 → …
Project: Research
-
Ion implantation
Terwagne, G. (PI), BODART, F. (CoI), Lucas, S. (CoI), Colaux, J. (Researcher), DEMARCHE, J. (Researcher), Genard, G. (Researcher), Nelis, A. (Researcher) & Debarsy, P.-L. (PI)
1/09/84 → …
Project: Research
-
Caracterisation of layered structures by ion bombardment
BODART, F. (PI), Demortier, G. (PI), Lucas, S. (PI), Terwagne, G. (PI), Colaux, J. (Researcher) & DEMARCHE, J. (Researcher)
1/09/84 → …
Project: Research
-
Finished
SETROPA: Separation by dry distillation at high temperature of the couple Rh-Pd(SETROPA)
BODART, F. (PI), Hubert, R. (Researcher) & Lucas, S. (CoI)
1/03/02 → 28/02/05
Project: Research
-
Influence of the water vapor concentration into the reactive plasma during the deposition of chromium oxynitrides layers on steel
BODART, F. (PI)
31/08/98 → 29/06/02
Project: PHD
-
Study of nuclear reactions induced by heavy ions
Terwagne, G. (PI), BODART, F. (CoI) & Mathot, G. (Researcher)
31/08/98 → 30/08/04
Project: PHD
-
Study of the process in view to obtain decorative layers on steels by reactive DC magnetron sputtering. Characterisation of the nucleation of these films on iron substrate
BODART, F. (PI), Terwagne, G. (CoI) & Roquiny, P. (Researcher)
1/09/94 → 5/05/00
Project: PHD
-
Characterisation of thin layers of Sialon obtained by nitrogen and oxygen implantation in Si-Al coatings
BODART, F. (PI), Terwagne, G. (CoI) & Jacobs, M. (Researcher)
1/09/93 → 1/04/98
Project: PHD
-
Neon implantation into monocrystals : structure of the neon implanted into beryllium monocrystal
BODART, F. (PI)
1/09/92 → 1/06/98
Project: Research
-
The study of defects produced in alumina after Nitrogen and Neon implantation
BODART, F. (PI)
1/09/91 → 31/08/02
Project: Research